Kidder County, North Dakota — Interconnection Projects
The interXdata warehouse tracks 5 interconnection projects in Kidder, North Dakota, representing 1,137 MW of requested capacity.
5Total projects
0Active
0Operational
5Withdrawn
1,137 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 3 | 917 MW |
| Battery | 1 | 200 MW |
| Wind | 1 | 20 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Leland Olds (Secondary) - Groton 345 kV line | GEN-2022-247 | Solar | 375.0 MW | withdrawn | Kidder, North Dakota |
| Leland Olds (Secondary) - Groton 345 kV line | GEN-2022-246 | Solar | 342.0 MW | withdrawn | Kidder, North Dakota |
| Line tap of existing Leland Olds (Secondary) - Groton 345 kV line | GEN-2022-245 | Battery | 200.0 MW | withdrawn | Kidder, North Dakota |
| Leland Olds (Secondary) - Groton 345 kV Line | GEN-2024-225 | Solar | 200.0 MW | withdrawn | Kidder, North Dakota |
| MISO Queue Project G993 — Wind in Kidder, North Dakota | G993 | Wind | 20.0 MW | withdrawn | Kidder, North Dakota |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Kidder County.