Kidder County, North Dakota — Interconnection Projects

The interXdata warehouse tracks 5 interconnection projects in Kidder, North Dakota, representing 1,137 MW of requested capacity.

5Total projects
0Active
0Operational
5Withdrawn
1,137 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar3917 MW
Battery1200 MW
Wind120 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Leland Olds (Secondary) - Groton 345 kV lineGEN-2022-247Solar375.0 MWwithdrawnKidder, North Dakota
Leland Olds (Secondary) - Groton 345 kV lineGEN-2022-246Solar342.0 MWwithdrawnKidder, North Dakota
Line tap of existing Leland Olds (Secondary) - Groton 345 kV lineGEN-2022-245Battery200.0 MWwithdrawnKidder, North Dakota
Leland Olds (Secondary) - Groton 345 kV LineGEN-2024-225Solar200.0 MWwithdrawnKidder, North Dakota
MISO Queue Project G993 — Wind in Kidder, North DakotaG993Wind20.0 MWwithdrawnKidder, North Dakota

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.