Line tap Wolf Creek-Blackberry 345 kV (GEN-2021-026)

Line tap Wolf Creek-Blackberry 345 kV is a 200.0 MW solar interconnection project in Barton, Missouri with a current status of withdrawn. It is proposed to connect at Line tap Wolf Creek-Blackberry 345 kV.

200.0 MWCapacity
WithdrawnStatus
MOMarket
SolarTechnology

Project facts

Canonical nameLine tap Wolf Creek-Blackberry 345 kV
Queue IDGEN-2021-026
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologySolar
Capacity200.0 MW
StateMissouri
CountyBarton
Point of interconnectionLine tap Wolf Creek-Blackberry 345 kV
Requested (queue) date2021-05-14
Proposed in-service date2027-11-28
Operational date
Withdrawn date2023-07-17
Developer
Utility / transmission ownerNextera

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata