Barton County, Missouri — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in Barton, Missouri, representing 687 MW of requested capacity.
4Total projects
0Active
1Operational
3Withdrawn
687 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 3 | 537 MW |
| Wind | 1 | 149 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Line tap Wolf Creek-Blackberry 345 kV | GEN-2021-026 | Solar | 200.0 MW | withdrawn | Barton, Missouri |
| Asbury 161 kV Substation | GEN-2024-259 | Solar | 199.8 MW | withdrawn | Barton, Missouri |
| North Fork Ridge Wind Energy Center | 62478_NFRW1 | Wind | 149.4 MW | operational | Barton, Missouri |
| Wolf Creek-Blackberry 345 kV | GEN-2022-053 | Solar | 137.5 MW | withdrawn | Barton, Missouri |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Barton County.
Start tracking with interXdata