Barton County, Missouri — Interconnection Projects

The interXdata warehouse tracks 4 interconnection projects in Barton, Missouri, representing 687 MW of requested capacity.

4Total projects
0Active
1Operational
3Withdrawn
687 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar3537 MW
Wind1149 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Line tap Wolf Creek-Blackberry 345 kVGEN-2021-026Solar200.0 MWwithdrawnBarton, Missouri
Asbury 161 kV SubstationGEN-2024-259Solar199.8 MWwithdrawnBarton, Missouri
North Fork Ridge Wind Energy Center62478_NFRW1Wind149.4 MWoperationalBarton, Missouri
Wolf Creek-Blackberry 345 kVGEN-2022-053Solar137.5 MWwithdrawnBarton, Missouri

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.