Little Bear 4 (62464_GEN01)

Little Bear 4 is a 50.0 MW solar interconnection project in Fresno, California with a current status of operational.

50.0 MWCapacity
OperationalStatus
CISOMarket
SolarTechnology

Project facts

Canonical nameLittle Bear 4
Queue ID62464_GEN01
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologySolar
Capacity50.0 MW
StateCalifornia
CountyFresno
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2020-12-01
Withdrawn date
Developer
Utility / transmission ownerLittle Bear Solar 3, LLC (Longroad)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata