Lloyd Sisson 115 Substation is a 140.0 MW solar interconnection project in Weld County, Colorado with a current status of active. It is proposed to connect at Lloyd Sisson 115 Substation.

140.0 MWCapacity
ActiveStatus
COMarket
SolarTechnology

Project facts

Canonical nameLloyd Sisson 115 Substation
Queue IDGI-TC-2024-22
Statusactive
Source statusFACILITY STUDY STAGE
MarketCO
TechnologySolar
Capacity140.0 MW
StateColorado
CountyWeld County
Point of interconnectionLloyd Sisson 115 Substation
Requested (queue) date2024-05-23
Proposed in-service date2028-03-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTSGT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; tristate-oasis. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.