LM Troy 138 kV (AH1-598)

LM Troy 138 kV is a 110.0 MW battery interconnection project in Ashland, Ohio with a current status of withdrawn.

110.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameLM Troy 138 kV
Queue IDAH1-598
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity110.0 MW
StateOhio
CountyAshland
Point of interconnection
Requested (queue) date2021-09-10
Proposed in-service date2025-03-03
Operational date
Withdrawn date2024-12-18
Developer
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata