LOCK STORAGE (1962)

LOCK STORAGE is a 500.0 MW battery interconnection project in Fresno, California with a current status of active. It is proposed to connect at Gates 500 kV.

500.0 MWCapacity
ActiveStatus
S500Market
BatteryTechnology

Project facts

Canonical nameLOCK STORAGE
Queue ID1962
Statusactive
Source statusACTIVE
MarketS500
TechnologyBattery
Capacity500.0 MW
StateCalifornia
CountyFresno
Point of interconnectionGates 500 kV
Requested (queue) date2021-04-15
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.