London 138 kV (AH2-213)

London 138 kV is a 140.0 MW solar interconnection project in Randolph, Indiana with a current status of withdrawn.

140.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameLondon 138 kV
Queue IDAH2-213
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity140.0 MW
StateIndiana
CountyRandolph
Point of interconnection—
Requested (queue) date2022-03-09
Proposed in-service date2026-12-31
Operational date—
Withdrawn date2025-02-04
Developer—
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata