Longfellow BESS II (24INR0455)

Longfellow BESS II is a 105.8 MW other interconnection project in Pecos, Texas with a current status of operational. It is proposed to connect at 38432 TNCENTRY2_1 138 KV .

105.8 MWCapacity
OperationalStatus
PecosMarket
OtherTechnology

Project facts

Canonical nameLongfellow BESS II
Queue ID24INR0455
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketPecos
TechnologyOther
Capacity105.8 MW
StateTexas
CountyPecos
Point of interconnection38432 TNCENTRY2_1 138 KV
Requested (queue) date2022-11-07
Proposed in-service date
Operational date2026-11-30
Withdrawn date
DeveloperCENTURY GAS PROCESSING, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.