Longfellow Solar I (24INR0452)

Longfellow Solar I is a 178.2 MW solar interconnection project in Pecos, Texas with a current status of operational. It is proposed to connect at 38431 TNCENTRY1_1 138 KV .

178.2 MWCapacity
OperationalStatus
PecosMarket
SolarTechnology

Project facts

Canonical nameLongfellow Solar I
Queue ID24INR0452
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketPecos
TechnologySolar
Capacity178.2 MW
StateTexas
CountyPecos
Point of interconnection38431 TNCENTRY1_1 138 KV
Requested (queue) date2022-11-07
Proposed in-service date
Operational date2028-12-31
Withdrawn date
DeveloperCENTURY GAS PROCESSING, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata