Longhorn Storage (68878_LONGH)

Longhorn Storage is a 165.0 MW battery interconnection project in Eastland, Texas with a current status of operational.

165.0 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameLonghorn Storage
Queue ID68878_LONGH
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity165.0 MW
StateTexas
CountyEastland
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2024-09-01
Withdrawn date
Developer
Utility / transmission ownerLonghorn Storage LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata