Longwood - Lieberman 138 kV (GEN-2023-155)

Longwood - Lieberman 138 kV is a 200.0 MW solar interconnection project in Caddo, Louisiana with a current status of withdrawn. It is proposed to connect at Longwood - Lieberman 138 kV.

200.0 MWCapacity
WithdrawnStatus
LAMarket
SolarTechnology

Project facts

Canonical nameLongwood - Lieberman 138 kV
Queue IDGEN-2023-155
Statuswithdrawn
Source statusWITHDRAWN
MarketLA
TechnologySolar
Capacity200.0 MW
StateLouisiana
CountyCaddo
Point of interconnectionLongwood - Lieberman 138 kV
Requested (queue) date2023-10-02
Proposed in-service date2028-06-01
Operational date
Withdrawn date2024-03-15
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.