Caddo County, Louisiana — Interconnection Projects

The interXdata warehouse tracks 13 interconnection projects in Caddo, Louisiana, representing 1,730 MW of requested capacity.

13Total projects
2Active
7Operational
4Withdrawn
1,730 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas81,042 MW
Solar4638 MW
Battery150 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
J Lamar Stall Unit56565_6STGGas256.0 MWoperationalCaddo, Louisiana
Longwood - Lieberman 138 kVGEN-2023-155Solar200.0 MWwithdrawnCaddo, Louisiana
Longwood 345kV SubstationGEN-2018-050Solar200.0 MWactiveCaddo, Louisiana
J Lamar Stall Unit56565_6BGas184.0 MWoperationalCaddo, Louisiana
J Lamar Stall Unit56565_6AGas184.0 MWoperationalCaddo, Louisiana
Longwood 345kV substationGEN-2018-106Solar165.0 MWactiveCaddo, Louisiana
Arsenal Hill1416_5Gas125.0 MWoperationalCaddo, Louisiana
Lieberman1417_4Gas114.0 MWoperationalCaddo, Louisiana
Lieberman1417_3Gas114.0 MWoperationalCaddo, Louisiana
Rocking R Solar, LLC65941_RRSSolar72.5 MWoperationalCaddo, Louisiana
Longwood 345kVGEN-2018-105Battery50.0 MWwithdrawnCaddo, Louisiana
SWEPCO Midway No. 832 12.5 kV SubstationASGI-2024-022Gas32.7 MWwithdrawnCaddo, Louisiana
SWEPCO Midway No. 832 12.5 kV SubstationGEN-2024-126Gas32.7 MWwithdrawnCaddo, Louisiana

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.