Longwood to Scottville 138 kV line (GEN-2022-038)

Longwood to Scottville 138 kV line is a 180.0 MW solar interconnection project in Harrison, Texas with a current status of active. It is proposed to connect at Longwood to Scottville 138 kV line.

180.0 MWCapacity
ActiveStatus
TXMarket
SolarTechnology

Project facts

Canonical nameLongwood to Scottville 138 kV line
Queue IDGEN-2022-038
Statusactive
Source statusIA FULLY EXECUTED/ON SUSPENSION
MarketTX
TechnologySolar
Capacity180.0 MW
StateTexas
CountyHarrison
Point of interconnectionLongwood to Scottville 138 kV line
Requested (queue) date2022-06-23
Proposed in-service date2030-04-02
Operational date
Withdrawn date
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata