Looff 230 kV (GEN-2026-SR26)

Looff 230 kV is a 150.0 MW battery interconnection project in Burlington, Colorado with a current status of active. It is proposed to connect at Looff 230 kV.

150.0 MWCapacity
ActiveStatus
COMarket
BatteryTechnology

Project facts

Canonical nameLooff 230 kV
Queue IDGEN-2026-SR26
Statusactive
Source statusSPECIAL STUDY
MarketCO
TechnologyBattery
Capacity150.0 MW
StateColorado
CountyBurlington
Point of interconnectionLooff 230 kV
Requested (queue) date2026-06-04
Proposed in-service date2028-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTri-State Generation and Transmission Association

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata