Looff 230 Substation (Burlington Expansion) (GI-SISS-2026-03)

Looff 230 Substation (Burlington Expansion) is a 150.0 MW battery interconnection project in Kit Carson County,, Colorado with a current status of operational. It is proposed to connect at Looff 230 Substation (Burlington Expansion).

150.0 MWCapacity
OperationalStatus
COMarket
BatteryTechnology

Project facts

Canonical nameLooff 230 Substation (Burlington Expansion)
Queue IDGI-SISS-2026-03
Statusoperational
Source statusDISIS STAGE
MarketCO
TechnologyBattery
Capacity150.0 MW
StateColorado
CountyKit Carson County,
Point of interconnectionLooff 230 Substation (Burlington Expansion)
Requested (queue) date2026-02-09
Proposed in-service date
Operational date2028-01-03
Withdrawn date
Developer
Utility / transmission ownerTSGT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.