Looff 230 Substation (Burlington Expansion) (GI-SISS-2026-03)
Looff 230 Substation (Burlington Expansion) is a 150.0 MW battery interconnection project in Kit Carson County,, Colorado with a current status of operational. It is proposed to connect at Looff 230 Substation (Burlington Expansion).
150.0 MWCapacity
OperationalStatus
COMarket
BatteryTechnology
Project facts
| Canonical name | Looff 230 Substation (Burlington Expansion) |
|---|---|
| Queue ID | GI-SISS-2026-03 |
| Status | operational |
| Source status | DISIS STAGE |
| Market | CO |
| Technology | Battery |
| Capacity | 150.0 MW |
| State | Colorado |
| County | Kit Carson County, |
| Point of interconnection | Looff 230 Substation (Burlington Expansion) |
| Requested (queue) date | 2026-02-09 |
| Proposed in-service date | — |
| Operational date | 2028-01-03 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | TSGT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata