Looff 230 Substation (BurlingtonExpansion) (GI-SISS-2026-03)

Looff 230 Substation (BurlingtonExpansion) is a 150.0 MW battery interconnection project in Kit Carson County,, Colorado with a current status of withdrawn. It is proposed to connect at Looff 230 Substation (BurlingtonExpansion).

150.0 MWCapacity
WithdrawnStatus
COMarket
BatteryTechnology

Project facts

Canonical nameLooff 230 Substation (BurlingtonExpansion)
Queue IDGI-SISS-2026-03
Statuswithdrawn
Source statusWITHDRAWN
MarketCO
TechnologyBattery
Capacity150.0 MW
StateColorado
CountyKit Carson County,
Point of interconnectionLooff 230 Substation (BurlingtonExpansion)
Requested (queue) date2026-02-09
Proposed in-service date2028-06-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerTSGT

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-01poi_nameLooff 230 Substation (Burlington Expansion)Looff 230 Substation (BurlingtonExpansion)low
2026-09-01statusoperationalwithdrawnhigh
2026-09-01proposed_online_date—2028-06-01medium
2026-09-01operational_date2028-01-03—medium
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata