Loretto-Wilton Center (AD2-137)

Loretto-Wilton Center is a 150.0 MW wind interconnection project in Will, Illinois with a current status of withdrawn.

150.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameLoretto-Wilton Center
Queue IDAD2-137
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity150.0 MW
StateIllinois
CountyWill
Point of interconnection
Requested (queue) date2018-03-23
Proposed in-service date2020-12-31
Operational date
Withdrawn date2019-06-28
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata