Lost Draw 3 115kV substation (GEN-2026-PR11)

Lost Draw 3 115kV substation is a 30.0 MW wind interconnection project in Cochran County, Texas with a current status of active. It is proposed to connect at Lost Draw 3 115kV substation.

30.0 MWCapacity
ActiveStatus
TXMarket
WindTechnology

Project facts

Canonical nameLost Draw 3 115kV substation
Queue IDGEN-2026-PR11
Statusactive
Source statusSPECIAL STUDY
MarketTX
TechnologyWind
Capacity30.0 MW
StateTexas
CountyCochran County
Point of interconnectionLost Draw 3 115kV substation
Requested (queue) date2026-02-28
Proposed in-service date2028-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerSPS

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata