Lower Rio Energy Storage (68496_LOWR1)

Lower Rio Energy Storage is a 60.0 MW battery interconnection project in Hidalgo, Texas with a current status of operational.

60.0 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameLower Rio Energy Storage
Queue ID68496_LOWR1
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity60.0 MW
StateTexas
CountyHidalgo
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-08-01
Withdrawn date
Developer
Utility / transmission ownerVESI 38 LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata