Lubbock East Interchange 230 kV Substation (GEN-2022-141)

Lubbock East Interchange 230 kV Substation is a 250.0 MW battery interconnection project in Lubbock, Texas with a current status of withdrawn. It is proposed to connect at Lubbock East Interchange 230 kV Substation.

250.0 MWCapacity
WithdrawnStatus
TXMarket
BatteryTechnology

Project facts

Canonical nameLubbock East Interchange 230 kV Substation
Queue IDGEN-2022-141
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyBattery
Capacity250.0 MW
StateTexas
CountyLubbock
Point of interconnectionLubbock East Interchange 230 kV Substation
Requested (queue) date2023-02-21
Proposed in-service date2027-12-31
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata