LUND STORAGE CENTER 1 (26INR0045)
LUND STORAGE CENTER 1 is a 407.6 MW other interconnection project in Bastrop, Texas with a current status of operational. It is proposed to connect at TAP 138 KV LINE AND CREATE NEW BUS BETWEEN KIMBRO (7337) AND ELGIN SWITCH (3650).
407.6 MWCapacity
OperationalStatus
BastropMarket
OtherTechnology
Project facts
| Canonical name | LUND STORAGE CENTER 1 |
|---|---|
| Queue ID | 26INR0045 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Bastrop |
| Technology | Other |
| Capacity | 407.6 MW |
| State | Texas |
| County | Bastrop |
| Point of interconnection | TAP 138 KV LINE AND CREATE NEW BUS BETWEEN KIMBRO (7337) AND ELGIN SWITCH (3650) |
| Requested (queue) date | 2023-01-17 |
| Proposed in-service date | — |
| Operational date | 2029-10-31 |
| Withdrawn date | — |
| Developer | Lund Storage Center 1, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata