LUND STORAGE CENTER 1 (26INR0045)

LUND STORAGE CENTER 1 is a 407.6 MW other interconnection project in Bastrop, Texas with a current status of operational. It is proposed to connect at TAP 138 KV LINE AND CREATE NEW BUS BETWEEN KIMBRO (7337) AND ELGIN SWITCH (3650).

407.6 MWCapacity
OperationalStatus
BastropMarket
OtherTechnology

Project facts

Canonical nameLUND STORAGE CENTER 1
Queue ID26INR0045
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketBastrop
TechnologyOther
Capacity407.6 MW
StateTexas
CountyBastrop
Point of interconnectionTAP 138 KV LINE AND CREATE NEW BUS BETWEEN KIMBRO (7337) AND ELGIN SWITCH (3650)
Requested (queue) date2023-01-17
Proposed in-service date
Operational date2029-10-31
Withdrawn date
DeveloperLund Storage Center 1, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata