Lunis Creek Solar 3 (21INR0547)

Lunis Creek Solar 3 is a 212.1 MW solar interconnection project with a current status of withdrawn. It is proposed to connect at tap the 345 kV Whitepoint (#8956) - South Texas Project (#5915); AEP.

212.1 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameLunis Creek Solar 3
Queue ID21INR0547
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity212.1 MW
State
County
Point of interconnectiontap the 345 kV Whitepoint (#8956) - South Texas Project (#5915); AEP
Requested (queue) date
Proposed in-service date2023-12-31
Operational date
Withdrawn date
DeveloperLunis Creek Solar Project, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata