Lupinus Storage 2 (24INR0155)

Lupinus Storage 2 is a 124.5 MW other interconnection project in Franklin, Texas with a current status of operational. It is proposed to connect at Hagansport Switch (old Monticello Tap bus# 1794).

124.5 MWCapacity
OperationalStatus
FranklinMarket
OtherTechnology

Project facts

Canonical nameLupinus Storage 2
Queue ID24INR0155
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketFranklin
TechnologyOther
Capacity124.5 MW
StateTexas
CountyFranklin
Point of interconnectionHagansport Switch (old Monticello Tap bus# 1794)
Requested (queue) date2021-12-13
Proposed in-service date
Operational date2027-04-03
Withdrawn date
DeveloperLupinus BESS 2, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata