Luyster Creek Energy Storage 3 (0930)

Luyster Creek Energy Storage 3 is a 15.0 MW battery interconnection project in Queens, New York with a current status of active. It is proposed to connect at North Queens 27kV.

15.0 MWCapacity
ActiveStatus
JMarket
BatteryTechnology

Project facts

Canonical nameLuyster Creek Energy Storage 3
Queue ID0930
Statusactive
Source status10
MarketJ
TechnologyBattery
Capacity15.0 MW
StateNew York
CountyQueens
Point of interconnectionNorth Queens 27kV
Requested (queue) date2019-10-25
Proposed in-service date
Operational date
Withdrawn date
DeveloperEastern Generation, LLC
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata