LWPC Wind (11INR0093)

LWPC Wind is a 41.0 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at Odem (#8810) or Sodville (#5618)-West Sinton (#5620) or Pelican (#80259)-Lon Hill (#8452).

41.0 MWCapacity
WithdrawnStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameLWPC Wind
Queue ID11INR0093
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyWind
Capacity41.0 MW
State
County
Point of interconnectionOdem (#8810) or Sodville (#5618)-West Sinton (#5620) or Pelican (#80259)-Lon Hill (#8452)
Requested (queue) date2010-10-18
Proposed in-service date2017-12-31
Operational date
Withdrawn date
DeveloperLonestar Wind Power
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.