Lynx Energy Storage (25INR0329)

Lynx Energy Storage is a 125.3 MW other interconnection project in Nueces, Texas with a current status of operational. It is proposed to connect at 138KV Tap 8921 Terra Verde - 8518 Kingsville.

125.3 MWCapacity
OperationalStatus
NuecesMarket
OtherTechnology

Project facts

Canonical nameLynx Energy Storage
Queue ID25INR0329
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketNueces
TechnologyOther
Capacity125.3 MW
StateTexas
CountyNueces
Point of interconnection138KV Tap 8921 Terra Verde - 8518 Kingsville
Requested (queue) date2023-03-08
Proposed in-service date
Operational date2026-05-01
Withdrawn date
DeveloperCorpus Battery Storage, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata