Lynx Energy Storage_Full (27INR0655)
Lynx Energy Storage_Full is a 50.0 MW other interconnection project in Nueces, Texas with a current status of active. It is proposed to connect at PRIMAVERA 138kV Substation.
50.0 MWCapacity
ActiveStatus
NuecesMarket
OtherTechnology
Project facts
| Canonical name | Lynx Energy Storage_Full |
|---|---|
| Queue ID | 27INR0655 |
| Status | active |
| Source status | SS Started, FIS Started, No IA |
| Market | Nueces |
| Technology | Other |
| Capacity | 50.0 MW |
| State | Texas |
| County | Nueces |
| Point of interconnection | PRIMAVERA 138kV Substation |
| Requested (queue) date | 2026-08-06 |
| Proposed in-service date | 2027-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Corpus Battery Storage, LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-30 | new_project | — | active | high |
Explore related data
Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata