Lyra Solar (27INR0434)

Lyra Solar is a 500.0 MW solar interconnection project in Borden, Texas with a current status of operational. It is proposed to connect at 345kV MULESHOE (#59922).

500.0 MWCapacity
OperationalStatus
BordenMarket
SolarTechnology

Project facts

Canonical nameLyra Solar
Queue ID27INR0434
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketBorden
TechnologySolar
Capacity500.0 MW
StateTexas
CountyBorden
Point of interconnection345kV MULESHOE (#59922)
Requested (queue) date2025-03-24
Proposed in-service date
Operational date2027-09-15
Withdrawn date
DeveloperJuno Solar 4
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata