Lyra Storage (26INR0636)

Lyra Storage is a 500.0 MW other interconnection project in Borden, Texas with a current status of operational. It is proposed to connect at 345kV MULESHOE (#59922).

500.0 MWCapacity
OperationalStatus
BordenMarket
OtherTechnology

Project facts

Canonical nameLyra Storage
Queue ID26INR0636
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketBorden
TechnologyOther
Capacity500.0 MW
StateTexas
CountyBorden
Point of interconnection345kV MULESHOE (#59922)
Requested (queue) date2025-05-27
Proposed in-service date
Operational date2026-11-12
Withdrawn date
DeveloperJUNO BESS I
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata