Mabton Substation (L0395)

Mabton Substation is a 50.3 MW other interconnection project in Wasco, Oregon with a current status of withdrawn. It is proposed to connect at Big Eddy-Midway #1 230kV transmission line.

50.3 MWCapacity
WithdrawnStatus
ORMarket
OtherTechnology

Project facts

Canonical nameMabton Substation
Queue IDL0395
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyOther
Capacity50.3 MW
StateOregon
CountyWasco
Point of interconnectionBig Eddy-Midway #1 230kV transmission line
Requested (queue) date2016-01-25
Proposed in-service date2019-10-01
Operational date
Withdrawn date
DeveloperBenton Rural Electric Association
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata