Machias II (0286)

Machias II is a 199.5 MW wind interconnection project in Cattaraugus, New York with a current status of withdrawn. It is proposed to connect at 345kV.

199.5 MWCapacity
WithdrawnStatus
AMarket
WindTechnology

Project facts

Canonical nameMachias II
Queue ID0286
Statuswithdrawn
Source status0
MarketA
TechnologyWind
Capacity199.5 MW
StateNew York
CountyCattaraugus
Point of interconnection345kV
Requested (queue) date2008-03-27
Proposed in-service date2009-04-08
Operational date
Withdrawn date
DeveloperMachias Wind Farm, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.