Macomb West (J3851)

Macomb West is a 200.0 MW battery interconnection project in McDonough, Illinois with a current status of withdrawn. It is proposed to connect at Macomb West.

200.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameMacomb West
Queue IDJ3851
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity200.0 MW
StateIllinois
CountyMcDonough
Point of interconnectionMacomb West
Requested (queue) date2024-12-31
Proposed in-service date2030-06-30
Operational date2030-06-30
Withdrawn date2025-12-19
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.