MADDOX DAIRY SOLAR (864)

MADDOX DAIRY SOLAR is a 19.9 MW solar interconnection project in Fresno, California with a current status of withdrawn. It is proposed to connect at Stroud 70 KV substation .

19.9 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMADDOX DAIRY SOLAR
Queue ID864
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity19.9 MW
StateCalifornia
CountyFresno
Point of interconnectionStroud 70 KV substation
Requested (queue) date2011-03-31
Proposed in-service date
Operational date
Withdrawn date2012-04-18
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata