Madena 4 (68520_MNDA4)
Madena 4 is a 5.0 MW battery interconnection project in Placer, California with a current status of active.
5.0 MWCapacity
ActiveStatus
CISOMarket
BatteryTechnology
Project facts
| Canonical name | Madena 4 |
|---|---|
| Queue ID | 68520_MNDA4 |
| Status | active |
| Source status | (L) Regulatory approvals pending. Not under construction |
| Market | CISO |
| Technology | Battery |
| Capacity | 5.0 MW |
| State | California |
| County | Placer |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | 2027-04-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ZGlobal Inc |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-09-02 | proposed_online_date | 2026-11-01 | 2027-04-01 | medium |
| 2026-08-02 | new_project | — | active | high |
Explore related data
Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata