Madison 138 KV SUBSTATION (J1357)

Madison 138 KV SUBSTATION is a 150.0 MW battery interconnection project in Madison County, Indiana with a current status of operational. It is proposed to connect at Madison 138 KV SUBSTATION.

150.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameMadison 138 KV SUBSTATION
Queue IDJ1357
Statusoperational
Source statusDone
Market
TechnologyBattery
Capacity150.0 MW
StateIndiana
CountyMadison County
Point of interconnectionMadison 138 KV SUBSTATION
Requested (queue) date2019-04-29
Proposed in-service date2023-05-30
Operational date2023-05-30
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata