Madison Solar 1 (AE2-308)

Madison Solar 1 is a 100.0 MW solar interconnection project in Madison, Kentucky with a current status of active. It is proposed to connect at Three Forks-Dale 138 kV.

100.0 MWCapacity
ActiveStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameMadison Solar 1
Queue IDAE2-308
Statusactive
Source statusactive
MarketPJM
TechnologySolar
Capacity100.0 MW
StateKentucky
CountyMadison
Point of interconnectionThree Forks-Dale 138 kV
Requested (queue) date2019-03-29
Proposed in-service date2021-05-31
Operational date
Withdrawn date
DeveloperAEUG Madison Solar, LLC
Utility / transmission ownerEKPC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.