Madison West 138kV Substation (J2823)

Madison West 138kV Substation is a 200.0 MW battery interconnection project in Jefferson, Indiana with a current status of withdrawn. It is proposed to connect at Madison West 138kV Substation.

200.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameMadison West 138kV Substation
Queue IDJ2823
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity200.0 MW
StateIndiana
CountyJefferson
Point of interconnectionMadison West 138kV Substation
Requested (queue) date2022-09-09
Proposed in-service date2025-03-01
Operational date2025-03-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.