Magnet Solar (28INR0297)

Magnet Solar is a 503.1 MW solar interconnection project in Borden, Texas with a current status of operational. It is proposed to connect at Faraday Substation 345kV - Bus #59905 .

503.1 MWCapacity
OperationalStatus
BordenMarket
SolarTechnology

Project facts

Canonical nameMagnet Solar
Queue ID28INR0297
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketBorden
TechnologySolar
Capacity503.1 MW
StateTexas
CountyBorden
Point of interconnectionFaraday Substation 345kV - Bus #59905
Requested (queue) date2025-04-21
Proposed in-service date
Operational date2028-10-06
Withdrawn date
DeveloperHyFuels Big Spring Solar LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata