Magnet Storage (28INR0298)

Magnet Storage is a 426.7 MW other interconnection project in Borden, Texas with a current status of operational. It is proposed to connect at Faraday 345 kV Substation (#59905).

426.7 MWCapacity
OperationalStatus
BordenMarket
OtherTechnology

Project facts

Canonical nameMagnet Storage
Queue ID28INR0298
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketBorden
TechnologyOther
Capacity426.7 MW
StateTexas
CountyBorden
Point of interconnectionFaraday 345 kV Substation (#59905)
Requested (queue) date2025-07-29
Proposed in-service date
Operational date2029-07-15
Withdrawn date
DeveloperHyFuels Big Spring Solar LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata