Maiden Creek Solar Power Plant (62668_PV1)

Maiden Creek Solar Power Plant is a 69.3 MW solar interconnection project in Catawba, North Carolina with a current status of operational.

69.3 MWCapacity
OperationalStatus
DUKMarket
SolarTechnology

Project facts

Canonical nameMaiden Creek Solar Power Plant
Queue ID62668_PV1
Statusoperational
Source status(OP) Operating
MarketDUK
TechnologySolar
Capacity69.3 MW
StateNorth Carolina
CountyCatawba
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2021-01-01
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata