Makanda North (J3516)

Makanda North is a 83.4 MW battery interconnection project in Jackson, Illinois with a current status of withdrawn. It is proposed to connect at Makanda North.

83.4 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameMakanda North
Queue IDJ3516
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity83.4 MW
StateIllinois
CountyJackson
Point of interconnectionMakanda North
Requested (queue) date2024-04-17
Proposed in-service date2026-05-25
Operational date2026-05-25
Withdrawn date2025-08-14
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.