Malachite BESS (27INR0112)

Malachite BESS is a 191.1 MW other interconnection project in Wharton, Texas with a current status of operational. It is proposed to connect at Tap 345 kV 44200 Hillje – 9073 Holman .

191.1 MWCapacity
OperationalStatus
WhartonMarket
OtherTechnology

Project facts

Canonical nameMalachite BESS
Queue ID27INR0112
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketWharton
TechnologyOther
Capacity191.1 MW
StateTexas
CountyWharton
Point of interconnectionTap 345 kV 44200 Hillje – 9073 Holman
Requested (queue) date2024-05-20
Proposed in-service date
Operational date2032-04-30
Withdrawn date
DeveloperMalachite Storage LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.