Maleza Solar is a 254.9 MW solar interconnection project in Wharton, Texas with a current status of operational. It is proposed to connect at tap Blue – Hillje 345 kv Ckt.#27.

254.9 MWCapacity
OperationalStatus
WhartonMarket
SolarTechnology

Project facts

Canonical nameMaleza Solar
Queue ID21INR0220
Statusoperational
Source statusSS Completed, FIS Not Started, IA
MarketWharton
TechnologySolar
Capacity254.9 MW
StateTexas
CountyWharton
Point of interconnectiontap Blue – Hillje 345 kv Ckt.#27
Requested (queue) date2018-12-06
Proposed in-service date
Operational date2028-12-31
Withdrawn date
DeveloperBrush Country Solar Project, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata