Mandeville - North Slidell 230kV Line (not listed on TTF, but both substations seem to have breakers (J2245)
Mandeville - North Slidell 230kV Line (not listed on TTF, but both substations seem to have breakers is a 100.0 MW solar interconnection project in St. Tammany, Louisiana with a current status of withdrawn. It is proposed to connect at Mandeville - North Slidell 230kV Line (not listed on TTF, but both substations seem to have breakers.
Project facts
| Canonical name | Mandeville - North Slidell 230kV Line (not listed on TTF, but both substations seem to have breakers |
|---|---|
| Queue ID | J2245 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Solar |
| Capacity | 100.0 MW |
| State | Louisiana |
| County | St. Tammany |
| Point of interconnection | Mandeville - North Slidell 230kV Line (not listed on TTF, but both substations seem to have breakers |
| Requested (queue) date | 2021-08-30 |
| Proposed in-service date | 2024-10-30 |
| Operational date | 2024-10-30 |
| Withdrawn date | 2023-10-25 |
| Developer | — |
| Utility / transmission owner | Cleco Power LLC |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.