Mandolin Solar II SLF (29INR0223)

Mandolin Solar II SLF is a 304.4 MW solar interconnection project in Starr, Texas with a current status of active. It is proposed to connect at Tap 345kV 80355 Del Sol - 80227 Rapido.

304.4 MWCapacity
ActiveStatus
StarrMarket
SolarTechnology

Project facts

Canonical nameMandolin Solar II SLF
Queue ID29INR0223
Statusactive
Source statusSS Started, FIS Started, No IA
MarketStarr
TechnologySolar
Capacity304.4 MW
StateTexas
CountyStarr
Point of interconnectionTap 345kV 80355 Del Sol - 80227 Rapido
Requested (queue) date
Proposed in-service date2029-06-15
Operational date
Withdrawn date
DeveloperMandolin Energy Center I, LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata