Mandolin Solar III SLF (29INR0224)
Mandolin Solar III SLF is a 250.0 MW solar interconnection project in Starr, Texas with a current status of active. It is proposed to connect at Tap 345kV 80355 Del Sol - 80227 Rapido.
250.0 MWCapacity
ActiveStatus
StarrMarket
SolarTechnology
Project facts
| Canonical name | Mandolin Solar III SLF |
|---|---|
| Queue ID | 29INR0224 |
| Status | active |
| Source status | SS Started, FIS Started, No IA |
| Market | Starr |
| Technology | Solar |
| Capacity | 250.0 MW |
| State | Texas |
| County | Starr |
| Point of interconnection | Tap 345kV 80355 Del Sol - 80227 Rapido |
| Requested (queue) date | 2026-09-04 |
| Proposed in-service date | 2029-06-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Mandolin Energy Center I, LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-30 | new_project | — | active | high |
Explore related data
Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.