Maplehurst Energy Park (C24-065)

Maplehurst Energy Park is a 75.0 MW solar+battery interconnection project in Chautauqua, New York with a current status of withdrawn. It is proposed to connect at Dunkirk - Falconer 115kV Line #160.

75.0 MWCapacity
WithdrawnStatus
NYISOMarket
Solar+BatteryTechnology

Project facts

Canonical nameMaplehurst Energy Park
Queue IDC24-065
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar+Battery
Capacity75.0 MW
StateNew York
CountyChautauqua
Point of interconnectionDunkirk - Falconer 115kV Line #160
Requested (queue) date2024-08-01
Proposed in-service date
Operational date
Withdrawn date
DeveloperHanwha Q CELLS USA
Utility / transmission ownerNM-NG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata