Marengo 34.5 kV Line (AI1-077)

Marengo 34.5 kV Line is a 15.8 MW solar interconnection project in McHenry, Illinois with a current status of withdrawn.

15.8 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameMarengo 34.5 kV Line
Queue IDAI1-077
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity15.8 MW
StateIllinois
CountyMcHenry
Point of interconnection—
Requested (queue) date2022-07-15
Proposed in-service date2025-10-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata