Marked Tree - Marion 161kV Line (J662)

Marked Tree - Marion 161kV Line is a 100.0 MW wind interconnection project in Crittenden County, Arkansas with a current status of withdrawn. It is proposed to connect at Marked Tree - Marion 161kV Line.

100.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameMarked Tree - Marion 161kV Line
Queue IDJ662
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity100.0 MW
StateArkansas
CountyCrittenden County
Point of interconnectionMarked Tree - Marion 161kV Line
Requested (queue) date2016-07-11
Proposed in-service date2018-10-15
Operational date2018-10-15
Withdrawn date2019-01-03
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata